Contractor Field-to-Office Worksheet

Find where job information creates extra office work

Agentive Automations | A ten-minute starting exercise

Choose one recently completed or active job. Follow a single piece of information from the field to the office. Use redacted examples and keep customer details out of anything you share publicly.

Company: __________ Job reference: __________ Date: __________

1. Choose the handoff

Select one: site notes/photos / estimate preparation / change information / job status / invoice preparation / other: __________

Who creates the original information? __________

Who needs it next? __________

What must happen before the task is complete? __________

2. Trace the actual path

Step Person responsible Tool or channel Required information Was anything missing or re-entered? 
1     
2     
3     
4     
5     

3. Locate the repeated work

? Photos or notes arrived without a useful job reference.

? Someone chased a missing detail.

? A message was copied into another system.

? A spreadsheet duplicated information already stored elsewhere.

? An approval waited without a clear owner.

? Office staff reconstructed what happened on site.

? Invoice preparation depended on finding information in several places.

Which problem appears on multiple jobs? __________

Who has the clearest view of that problem? __________

4. Put a measured size on it

Monthly occurrences across the company: ______

Total active staff minutes per occurrence: ______

Monthly active hours = occurrences x active minutes / 60: ______

Optional loaded hourly cost and source: $______ / ______

Indicative capacity involved = hours x hourly cost: $______

Illustration only: 60 handoffs x 15 active minutes / 60 = 15 hours/month. Faster invoice preparation is a separate cycle-time measure. Do not label the invoice amount as new revenue or add the same time saving twice.

5. Choose a first test

What information should be captured once at the source? __________

Which system should hold the official record? __________

Which decision needs human approval? __________

What would a useful first milestone change? __________

What would make the first attempt fail? __________

Baseline: __________ Target to validate: __________ Process owner: __________

Want a practical implementation plan?

Agentive Automations reviews up to three workflows through one owner interview, one staff interview and a written roadmap. Designed for contractors doing $2M+ annually. Request the current scope at https://agentiveautomations.com/contractor-workflow-diagnostic.

You can implement the roadmap with your own team or discuss ongoing building and optimization with us.